What Happens During Installation
What Happens During a Kitchen Installation?
Having a new kitchen installed is an exciting project, but knowing what to expect can make the process much easier. From removing the old kitchen to installing the cabinets, worktops and appliances, there are several stages involved.
A well-planned installation should follow a clear sequence, with different trades and tasks coordinated throughout the project.
Before work starts, your kitchen should have been fully designed and measured.
This is the stage where important details are confirmed, including:
- Kitchen layout
- Cabinet positions
- Worktops
- Appliances
- Sink and taps
- Lighting
- Electrical requirements
- Plumbing requirements
- Flooring and wall finishes
Good preparation helps reduce unexpected problems once installation begins.
Removing the old kitchen
If you’re replacing an existing kitchen, the first stage will normally involve removing the old units, appliances and worktops.
Depending on the project, flooring, wall coverings or other elements may also need to be removed.
This stage can reveal issues that weren’t visible during the initial survey, such as damaged walls, old plumbing or outdated electrical installations.
Preparing the room
Once the old kitchen has been removed, the room can be prepared for the new installation.
This might include:
- Plumbing alterations
- Electrical work
- Plastering
- Flooring
- Wall preparation
- Repairs
- Decorating
Completing these jobs before the new cabinets are installed helps create a better finished result.
Installing the cabinets
The kitchen cabinets are then assembled and installed according to the agreed design.
Units need to be carefully positioned and levelled to ensure that doors, drawers, appliances and worktops fit correctly.
Worktops and appliances
Once the cabinetry is in position, worktops can be measured, fabricated where necessary and installed.
Appliances, sinks, taps and other components can then be fitted and connected by the appropriate trades.
Finishing touches
The final stage involves checking the kitchen, adjusting doors and drawers, completing trim and ensuring everything works as intended.
A professional installation should include a final inspection to identify any outstanding issues.
Planning makes the difference
The smoother a kitchen installation is planned, the easier the process tends to be.
At Broadoak Kitchens, we can help coordinate the different stages of your kitchen project from initial design through to installation.

Preparing Your Home
How to Prepare Your Home for a New Kitchen
Preparing your home before your kitchen installation begins can make the process easier and help minimise disruption.
A little preparation beforehand can also protect other areas of your home from dust, dirt and building work.
Remove food, crockery, utensils and other items from your existing cabinets and worktops.
It’s a good opportunity to sort through items you no longer use before packing everything away.
Create a temporary kitchen
Depending on the size of the project, you may be without a functioning kitchen for a period of time.
Consider setting up a temporary area with:
- Microwave
- Kettle
- Toaster
- Small fridge
- Basic cooking equipment
- Plates and utensils
Even a simple temporary kitchen can make the installation period much easier.
Protect other areas of your home
Kitchen installations can create dust and debris.
Where appropriate, protect floors and furniture in nearby areas and consider how installers will move materials through your home.
Think about deliveries
Kitchen cabinets, appliances and worktops can require significant space.
Make sure there is a suitable route into the property and consider where deliveries can be safely stored if everything cannot be installed immediately.
Make arrangements for children and pets
Building work can create hazards that aren’t normally present in your home.
Keep children and pets away from the work area and follow any safety instructions provided by your installer.
Plan around essential appliances
If your existing fridge, freezer or other appliances need to be disconnected, think about how you’ll manage food and cooking during the installation.
Prepare for some disruption
Even a well-managed installation will involve some noise, dust and disruption.
Knowing this in advance can make the process much less stressful.
A little preparation goes a long way
Your kitchen installer should explain what needs to happen before work begins.
Good communication between the homeowner and installation team is one of the best ways to keep the project running smoothly.

Timescales
How Long Does a Kitchen Installation Take?
One of the most common questions homeowners ask when planning a new kitchen is how long the installation will take.
There isn’t one answer because every kitchen project is different. The timescale depends on the size of the kitchen, the amount of preparation required, the complexity of the design and whether additional building work is involved.
A straightforward kitchen replacement can often be completed relatively quickly once the room has been prepared and all materials are available.
This type of project may involve removing the existing kitchen, installing new cabinets, fitting worktops and connecting appliances.
Larger kitchen renovations
A more extensive renovation can take considerably longer.
Additional work might include:
- Plastering
- Electrical alterations
- Plumbing
- Flooring
- Structural work
- New lighting
- Decorating
- Building work
Each additional stage can affect the overall programme.
What can cause delays?
Potential delays can include:
- Materials arriving late
- Damaged components
- Worktops requiring fabrication
- Unexpected problems behind existing cabinets
- Plumbing issues
- Electrical work
- Building work
- Changes made during the installation
Why planning matters
A detailed kitchen plan can help identify potential problems before installation begins.
Confirming cabinet dimensions, appliance specifications, worktop requirements and services in advance can reduce unnecessary delays.
What happens before installation?
The installation itself is only one part of the overall project.
The design, survey, ordering, manufacturing and delivery stages all happen before the installation team begins work.
How long will your kitchen take?
The best way to establish a realistic timescale is to discuss the complete project with your kitchen company.
A professional installer should be able to explain the expected sequence of work and identify any stages that could affect the completion date.

Plumbing & Electrics
Plumbing and Electrical Work During a Kitchen Installation
Plumbing and electrical services are an important part of any kitchen renovation. Even when the layout remains similar, your new cabinets and appliances may require changes to existing services.
Planning these requirements early can help prevent problems during installation.
Plumbing may be required for:
- Kitchen sinks
- Taps
- Dishwashers
- Washing machines
- Water filtration systems
- Boiling water taps
- Refrigerators with water connections
Changing the position of a sink or dishwasher can require pipework to be altered.
Kitchen electrics
Modern kitchens can contain a significant number of electrical appliances.
These may include:
- Ovens
- Hobs
- Microwaves
- Extractors
- Dishwashers
- Refrigerators
- Freezers
- Washing machines
- Small appliances
- Lighting
The electrical installation therefore needs to be carefully planned around the kitchen layout.
Appliance positions matter
Appliance specifications should be confirmed before finalising the kitchen design.
The location and power requirements of an appliance can affect cabinet sizes, ventilation, sockets and connections.
Moving your sink
Moving a sink can sometimes involve more work than simply moving the cabinet.
The position of water supplies and waste pipes needs to be considered, along with access beneath the floor or within walls where necessary.
Electrical safety
Kitchen electrical work should be carried out by appropriately qualified professionals and in accordance with current requirements.
Your installer should be able to explain what electrical work is required as part of your project.
Plan services before installation
One of the biggest mistakes is treating plumbing and electrics as an afterthought.
The position of sockets, switches, lights, appliances and water connections should be considered during the design stage.
A coordinated approach
When the kitchen designer, installer and relevant trades communicate properly, plumbing and electrical work can be completed at the appropriate stage of the project.

Decorating Afterwards
Decorating After a New Kitchen Installation
Once your new kitchen has been installed, decorating provides the finishing touch and helps bring the entire design together.
However, it’s important to plan decorating work carefully so that newly installed cabinets, worktops and appliances aren’t damaged.
In many projects, some decorating or wall preparation is completed before the kitchen is installed.
Final decorating can then be completed once the cabinets, worktops and other elements are in place.
This approach can allow decorators to finish around the completed kitchen more accurately.
Walls and ceilings
Walls and ceilings may need to be repaired, plastered or prepared before painting.
If the old kitchen has been removed, you may find areas that require additional preparation.
Choosing kitchen paint
Kitchen walls are exposed to moisture, heat and occasional splashes.
A durable, washable paint can therefore be a practical choice.
Consider the overall cabinet and worktop colours when choosing your wall colour.
Splashbacks
Your splashback can become an important part of the overall design.
Options can include:
- Tiles
- Glass
- Quartz
- Natural stone
- Solid surface materials
- Decorative panels
The right choice will depend on your kitchen style and practical requirements.
Flooring
If you’re replacing the flooring, the timing will depend on the type of flooring and how the kitchen is being installed.
Your installer should explain whether flooring needs to be completed before or after the cabinets are fitted.
Finishing touches
Once the main decorating is complete, accessories can help personalise the room.
Consider:
- Lighting
- Curtains or blinds
- Artwork
- Plants
- Shelving
- Kitchen accessories
- Dining furniture
Don’t rush the final stage
The finishing touches can have a surprisingly large impact on how the completed kitchen looks.
Taking time to choose complementary colours, lighting and accessories can help turn a newly installed kitchen into a space that feels genuinely finished.


